The new 3.37 million Aseptic Unit for Craigavon Area Hospital is now open. The creation of this unit is to allow for the preparation and dispensing of sterile medical products and specialised medications such as chemotherapy which requires great expertise in particularly controlled environmental conditions.

The Architects specified Swisspearl Fibre cement cladding for the external façade. The life expectancy of the panel is in excess 60 years and the panels are manufactured and pre-cut in the factory ready to install. Fire Classification A2 s1 d.

Photo Gallery:

Architects: Todd
Contractors: Felix O’Hare
Contract Value: £3.37 Million
Swisspearl Panels: Zenor 15015, 63077 and 67014